What HIRA means
HIRA stands for Hazard Identification and Risk Assessment. A hazard is something that can cause harm. Risk is how likely that harm is and how severe it would be.
The steps
- Break the job into steps.
- Identify the hazards at each step.
- Decide who could be harmed and how.
- Rate likelihood and severity, usually on a 1 to 5 scale each, and multiply to get a risk rating.
- Choose controls, starting from elimination, then substitution, engineering controls, administrative controls and finally PPE.
- Record the rating, assign owners and review after changes or incidents.
A worked example
Working at height on a scaffold: hazard is a fall. If likelihood is 3 and severity is 5, the rating is 15, which is high. Controls include inspected scaffolds, edge protection, harnesses and a permit to work, which should lower the rating before work starts.

